5 Whys Template for Maintenance Failures
Letter & A4. Print-ready. Free, no email required.
← Back to toolkit · Browse by chapterUsing the template
Walk one failure back to a cause you can change.
A 5 whys template is a one-page sheet for finding the root cause of a single failure. You write the failure in one sentence. You ask why it happened, then why that happened. You stop when the answer is something you can change, such as a missing PM or a skipped step. Then you test it: would fixing this stop the failure coming back?
- The worksheet below, printable as a PDF in Letter and A4.
- The stop rule and the confirmation test, so the chain ends at a real cause.
- An actions table that turns the root cause into work orders with owners.
- A 90-day follow-up check to see if the fix held.
Use it when the failure is one straight line.
- Use 5 whys when
- One asset failed once, recently. You can picture the causes as a straight line with no branches. The technician, the planner and the supervisor can sit for 20 to 30 minutes within 48 hours.
- Switch tools when
- Several conditions came together, or the problem is a slow drift instead of one event. Run a Fishbone session. If the asset is new or modified and has not failed yet, that is FMEA work.
Not sure which one you have? The RCA Picker Flowchart decides in three questions.
A filled example: the broken belt.
Example from Fix the System, Chapter 13.
Failure: a drive belt broke.
- Why did the belt break? Because the tension was wrong.
- Why was the tension wrong? Because the tensioner spring had fatigued.
- Why had the spring fatigued? Because it was original to the asset, 23 years old, and had never been on a PM.
Root cause: the tensioner spring was never on a PM. That is something you can change, so you stop.
Three whys were enough. Five is a rule of thumb. Next, the worksheet asks two more things: which work order fixes this drive now, and which other drives still run an original spring.
Answers that mean you are not done.
- Operator error. Why did the operator take that action?
- Part failure. Why did the part fail?
- Wear and tear. That describes the failure. It does not explain it.
- We don't know. Then the investigation is not finished.
Questions planners ask
- How many whys do you need?
- As many as it takes to reach a cause you can change. Sometimes three, sometimes seven. If the last answer only restates the symptom, keep going. If it points at a missing PM, a training gap, a procedure not followed or a part number substitution, stop there and run the confirmation test.
- Who should be in the room?
- The technician who did the repair, the planner and the supervisor. Three people. Do it within 48 hours, while the repair is fresh. Attach the sheet to the asset's record in your CMMS, next to the work order close-out, so the next person who opens that asset can find it.
- When is 5 whys the wrong tool?
- When a why has more than one true answer. A seal can fail from the wrong material, misalignment and a pressure spike at the same time. Follow one branch and you miss the others. If you catch yourself rewriting the chain because there is another branch, stop and run a Fishbone session.
- What should a 5 whys end with?
- At least one work order and at least one change to a standard, a procedure or training. If neither exists, the analysis is not finished. Ninety days later, check the asset. If the failure came back, the action never closed, the change did not hold, or the cause was wrong.
Subscribe to The Floor Report: one short essay on maintenance systems every week.
The PDF remains the blank worksheet. This web guide is excluded from printing so it does not add pages to the form.
A 20-minute structured conversation for linear, single-event failures. Fill out in order. Stop when the last "why" points to something you can actually change.
Companion to: Fix the System, Chapter 13. Who uses it: the technician who did the repair + the planner + the supervisor. Three people. When: within 48 hours of the failure, while the repair is fresh. Time to complete: 20 to 30 minutes. Filed where: attached to the asset's CMMS record alongside the work-order close-out. Referenced in the work order's Notes field.
Header
Date: ____________ Facilitator: ____________________________
Asset tag: ____________ Asset description: _____________________
Work order #: ____________ Failure code: ________________________
Participants (name + role):
- _____________________________________________
- _____________________________________________
- _____________________________________________
The failure event
One sentence. Specific equipment. Specific date. Specific symptom.
_______________________________________________________________
_______________________________________________________________
When was the last prior failure on this asset (same or similar failure code)? Date: ____________
Is this the third or greater occurrence of this failure code in the last 12 months?
- Yes — this is a repeat failure and RCA is required.
- No — RCA is discretionary. Continue if the failure was costly, unexpected, or safety-adjacent.
Before you start: tool check
5 Whys is the right tool only when the cause chain is linear and recent. Check:
- A single, identifiable failure event (not a slow drift, not multiple events combined).
- The sequence of causes can be imagined as a straight line with no branches.
- A 20-minute conversation will likely identify the root.
If any of these is not true, stop and switch to a Fishbone session. This worksheet will not give you a useful answer on a multi-cause problem.
The chain
Fill each row in order. For each "Why," the next row's "Because" is the cause of the prior row's effect.
You do not have to fill all five rows. Stop as soon as the last "Because" points to something you can actually change (a missing PM, a training gap, a procedure not followed, a part number substitution). The number five is a rule of thumb, not a law.
Why 1
Why did the failure event happen?
Because ________________________________________________________
_______________________________________________________________
Why 2
Why did that happen?
Because ________________________________________________________
_______________________________________________________________
Why 3
Why did that happen?
Because ________________________________________________________
_______________________________________________________________
Why 4
Why did that happen?
Because ________________________________________________________
_______________________________________________________________
Why 5
Why did that happen?
Because ________________________________________________________
_______________________________________________________________
Root cause
The last "Because" above is the candidate root cause. Write it below in one sentence, using plain language.
Candidate root cause: _____________________________________
_______________________________________________________________
The confirmation test
A candidate root cause is only a root cause if addressing it would prevent the chain from starting again. Answer:
If we fix the candidate root cause above, does that prevent this failure from recurring on this asset, and on similar assets with similar conditions?
- Yes. Continue to Actions section.
- No, or uncertain. The chain is not complete. One of three things is true:
- You have not walked back far enough → add more "Why" rows on a continuation sheet and keep going.
- The chain has branches and 5 Whys cannot capture them → stop and switch to Fishbone.
- The answer is a category of cause, not a cause → rewrite it specifically.
Sanity-check phrases that usually mean you have not found the root:
- "Operator error" (why did the operator take that action?)
- "Part failure" (why did the part fail?)
- "Wear and tear" (wear and tear is a description, not a cause)
- "We don't know" (then the investigation is not done)
Actions
Every root cause produces at least one work order and at least one standard / procedure / training review. If none, the RCA is incomplete.
Mitigation work orders (immediate fix)
| What | WO # opened | Owner | Due date |
|---|---|---|---|
Standard / procedure / training changes (systemic fix)
What changes, specifically? (An SOP revision, a PM interval change, a failure-code update, a training module, a spare-parts stocking decision.)
| Change | Where it lives (SOP #, PM #, training #, failure code, parts) | Owner | Due |
|---|---|---|---|
Similar assets affected
Does the same root cause likely exist on any other asset with similar conditions? Name them. Open a tracking work order for each.
- _________________________________________________________
- _________________________________________________________
- _________________________________________________________
Review and sign-off
Participant sign-off
By signing, each participant agrees that the candidate root cause and the confirmation test above reflect the team's assessment.
Technician signature: ____________________ Date: ____________
Planner signature: ____________________ Date: ____________
Supervisor signature: ____________________ Date: ____________
Follow-up check (at 90 days from completion)
Has the failure recurred on the same asset? ☐ No ☐ Yes
If yes, one of three things is true:
- The root cause was correct but the action was not closed. (Audit the work orders.)
- The root cause was correct but the change did not hold. (Re-assess the action design.)
- The root cause was wrong. (Re-open as a Fishbone session.)
Follow-up check completed by: ____________ Date: ____________
File location
- Worksheet attached to CMMS record for asset tag ____________.
- Work orders from the Mitigation section opened in CMMS and referenced on this sheet.
- Procedure / standard / training changes submitted to the owning function within 30 days.
- Similar-asset tracking work orders opened (if any identified).
Free toolkit downloads and updates: getov.xyz/toolkit/fix-the-system/ch13