Book companion resource · Checklist
RCA Close-Loop Checklist
Letter & A4. Print-ready. Free, no email required.
← Back to toolkit · Browse by chapterEvery RCA produces an action list. Ninety percent of plants never implement half of the actions. This checklist is how the other ten percent do it.
Companion to: Fix the System, Chapter 16. Who uses it: the RCA owner (the reliability engineer, senior tech, or planner who led the session). When: filled out at the end of each RCA session. Follow-up verifications at 60 days and at 6 months. Why this exists: the single largest failure mode of RCA programs is running good sessions and then never implementing the corrective actions. The list sits in a folder for six months and dies. This checklist is the gate between "RCA completed" and "RCA closed." Nothing closes without the 60-day and 6-month verifications.
Part A — At the session (day 0)
Fill out at the end of the RCA facilitation session, before anyone leaves the room.
RCA ID: ____________________
Asset tag: ____________________
Failure code under investigation: ____________________
Session date: ____________________
Owner: ____________________
Facilitator: ____________________
Attendees: (name + role)
1. _______________________________________________ 2. _______________________________________________ 3. _______________________________________________ 4. _______________________________________________ 5. _______________________________________________ 6. _______________________________________________ 7. _______________________________________________
Required roles (check that each is represented)
- Technician who has done the repair most often
- Operator who runs the asset
- Planner who schedules the PM
- Reliability engineer
- Area supervisor
If any required role is missing, the session should have been rescheduled. Document why it proceeded anyway: _______________________________
Root causes identified (from the 5 Whys chain, Fishbone, or FMEA output)
1. _______________________________________________ 2. _______________________________________________ 3. _______________________________________________ 4. _______________________________________________
Corrective actions assigned
Every corrective action falls into one of four channels. Log each action with its channel.
| # | Action description | Channel (PM / CBM / SOP / Design) | Owner | Deadline |
|---|---|---|---|---|
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 | ||||
| 7 | ||||
| 8 |
Channel key:
- PM — PM procedure update (rewrite, new task, frequency change). Feeds into Chapter 15 PM Compliance Recovery.
- CBM — Condition-based monitoring install (sensor, threshold, alert). Feeds into Chapter 22 / Playbook 8.
- SOP — Operating procedure change, training, operator action. Operations signs off.
- Design — Design change, spec change, spare-part substitution. Engineering owns.
Verification dates (assign at session)
- 60-day check date: ____________________
- 6-month check date: ____________________
- Verification owner: ____________________ (often the RCA owner; may be delegated to the planner)
Sign-off at session close
| Role | Name | Signature |
|---|---|---|
| RCA owner | ||
| Facilitator | ||
| Asset area supervisor |
Part B — 60-day verification check
Completed on the 60-day check date.
Check completed on: ____________________ By: ____________________
For each corrective action from Part A, mark the implementation status:
| # | Action | Status (Implemented / In-progress / Blocked / Abandoned) | Evidence (document, procedure rev, PO number, etc.) | Blocker if applicable |
|---|---|---|---|---|
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 | ||||
| 7 | ||||
| 8 |
Summary:
- Actions implemented: ______ of ______
- Actions in-progress with revised deadline: ______ (list action numbers: __________)
- Actions blocked — escalated to plant manager: ______ (list action numbers: __________)
- Actions abandoned — documented reason: ______ (list action numbers: __________)
Asset status at 60-day check
- Asset has not failed under the same failure code since the RCA.
- Asset has failed under the same failure code since the RCA. → Re-open the RCA. Document on next page. Root cause was not addressed.
- Asset has failed under a different failure code since the RCA. → Log as new entry for future watch-list build.
Sign-off (60-day):
| Role | Name | Signature | Date |
|---|---|---|---|
| Verification owner | |||
| RCA owner (if different) |
Blocked actions — plant-manager escalation:
Any action that was blocked at 60-days gets escalated to the plant manager. Attach this page to the next weekly report.
Part C — 6-month recurrence verification
Completed on the 6-month check date.
Check completed on: ____________________ By: ____________________
Asset recurrence check
Pull the WO history for the asset since the RCA session date.
- Total WOs since RCA: ______
- WOs under the same failure code: ______
- WOs under related failure codes (same subsystem): ______
Verdict
- No recurrence. Zero WOs under the same failure code. The root cause was correctly identified and the corrective actions held. RCA closes.
- One recurrence, cause identified. One WO under the same code, investigation shows a different root cause than the one we addressed (e.g., a new failure mode emerged). Log as new watch-list entry. RCA closes on the original cause; new RCA scheduled on the new cause.
- Multiple recurrences — corrective action failed. Two or more WOs under the same code. Root cause was mis-identified or actions were insufficient. RCA does NOT close. Re-open for a second RCA session with the benefit of the additional data.
Supporting evidence
- All Part A actions listed as Implemented in Part B have been verified as still in effect (the procedure revision still shows in the CMMS, the CBM sensor still reports, the SOP is in the current binder).
- MTBF trend on the asset since the RCA: improving / flat / degrading (circle one).
- Operator and tech interview at 6 months: has the fix held from the floor's perspective? Y / N. Notes: ____________________
Sign-off (6-month close)
| Role | Name | Signature | Date |
|---|---|---|---|
| Verification owner | |||
| RCA owner | |||
| Reliability engineer (if different) | |||
| Area supervisor |
Final disposition:
- CLOSED — no recurrence. RCA filed as complete. Asset removed from watch list.
- CLOSED — new cause logged. Asset stays on watch list under the new failure code.
- RE-OPENED. Return to Part A for a second investigation.
What to avoid
- Closing the RCA at 60 days. The 6-month check is where half the recurrences show up. Premature close is the #2 failure mode of RCA programs (after "never implementing the actions"). Hold the close.
- Treating "Implemented" as the finish line. Implementation is necessary but not sufficient. The 6-month recurrence check is what verifies the implementation actually addressed the cause.
- Letting abandoned actions slide without documentation. If an action was abandoned, the reason goes in writing. This is how the program learns which channels work and which do not.
- Skipping the operator interview at 6 months. Data alone can lie. The operator knows whether the fix held on the floor. Ask.
- Accepting "we think it's better" as close. MTBF data, WO count data, or both. No vague confirmations.
End of checklist. File with the RCA session packet. Archive after final close.