Plant Floor

KPI Cascade / From result to responsibility

Pick a result.
Follow the connections.

See how a plant result connects to the work. Trace a path, find its owner, and take one practical change into your next review.

Start with any result. The connected drivers and measures light up as you go.

Your selected path

Click a card to trace another connection.

01 Plant resultWhat needs to improve?

02 Maintenance driverWhat could influence it?

03 Role measureWhere can someone act?

Explore the lit connections. Faded drivers belong to a different result.

Your pathAvailabilitySchedule ComplianceParts Kitting Rate
Why these connect & how to measure them

Completing committed maintenance can protect availability. Check whether missed jobs are contributing to the asset's downtime.

A scheduled job can stall if its materials are not ready. Check kit readiness against parts-related schedule misses.

Asset Availability

Example target ≥ 95%

Percentage of scheduled production time that equipment is available to run. A plant result influenced by maintenance, operations, and the agreed downtime definition.

How to measure
(Scheduled Time − Downtime) / Scheduled Time × 100. Track by asset, line, and plant using CMMS downtime tracking.
Why review it
Availability is the bridge between what maintenance does and what the plant needs. It's where maintenance earns — or loses — credibility with operations.

Watch for

  • Not distinguishing between planned and unplanned downtime
  • Inconsistent downtime recording across shifts
  • Excluding changeovers or minor stops from the calculation

Schedule Compliance

Example target ≥ 90%

Percentage of scheduled work completed in the week it was scheduled. Where planning meets reality.

How to measure
Work orders completed on schedule / work orders scheduled × 100. Measure weekly. Don't count mid-week additions.
Why review it
If you can't execute the schedule, you don't have a planning system — you have a wish list.

Watch for

  • Allowing the schedule to be broken without escalation
  • Padding the schedule so compliance looks good but throughput suffers
  • No weekly schedule-break analysis to understand why jobs slip

Parts Kitting Rate

Example target ≥ 90%

Percentage of scheduled jobs with all required parts staged before the start date.

How to measure
Jobs with parts kitted on time / total scheduled jobs requiring parts × 100.
Why review it
Missing materials can interrupt ready work. Physical kitting makes shortages visible before the job starts and can reduce avoidable trips and waiting.

Watch for

  • Parts listed on the work order but not physically staged
  • No lead-time buffer for ordering before scheduled date
  • Storeroom not aligned with the weekly schedule

Targets are examples. Agree definitions and targets for your assets, risk, and operating conditions.

04 / Put it to work

Availability → Schedule Compliance → Parts Kitting Rate

Confirm materials before schedule release.

Owner
Planner / storeroom
Review cadence
Before the weekly schedule is released; review parts-related misses at the weekly schedule review.
What to check together
Check each job requiring parts against the physical kit and work order. Record shortages, assign a resolution owner, and hold unready work out of the committed schedule. Compare those misses with schedule compliance.

This is a pathway to investigate, not proof of cause. Review the role measure, driver, and plant result together before judging whether the change helped.

Keep the work connected

Take the chain into your next review.

Fix the System connects preparation, scheduling, execution, and feedback. Use its companion worksheets to record the evidence and agree the next change.

Put Fix the System to work

One improvement. Three useful views.

Open the book’s worksheets
  1. 01Explore

    Choose the right tool

    Start with your role and the foundations your plant has in place.

    Maintenance Tool Roadmap
  2. 02Explore

    Trace what moves the KPI

    Find the supporting systems and the first change to investigate.

    KPI System Map
  3. 03You are here

    Give the change an owner

    Connect the result to a role measure, a practical action, and a review.

    KPI Cascade Framework

Use the book’s cycle and playbook picker to choose a response, then bring the relevant worksheet to the team. These connections guide an investigation; they do not prove a cause.

The complete reference

Browse all 22 metrics.

The books behind the tools

Build the system behind the result.

Fix the System book cover

Maintenance systems & execution

Fix the System

The operational field manual: prepare the work, protect the schedule, and close the feedback loop.

Leadership Isn't Personal book cover

Leadership & accountability

Leadership Isn't Personal

The leadership context: clear standards, supported ownership, and early responses to system drift.